Factory price industrial 2 ton steam boiler
Fuel gas-fired boiler is different from coal-fired boilers, which requires the use of a burner fuel is injected into the boiler furnace using a combustion chamber without the use of fire grate facilities. Because not produce fuel ash after burning fuel gas-fired boiler, fuel gas-fired boiler so without slagging facilities. If the hydrocarbon injected into the furnace with the air mixing within a certain range, or turned off, it is easy to explode. Therefore, fuel gas-fired boiler combustion required to adopt automation and control systems. Fuel gas boiler compact, small boiler and ventilation, water supply, control and auxiliary equipment are arranged on a chassis, the assembly may also be medium-sized factory. Now the main element and the pressure connection of the fuel gas boiler are as follows:
To proceed from reality, should be in accordance with the electric power, gas should the gas, the coal should be coal, should be hot the thermal principle, promote the use of all kinds of clean energy for winter heating cleaning. In order to reduce air pollution and protect people's warm winter as a foothold to enterprises, government promotion, residents can withstand the principle of gas after the first change to gas will change in gas assurance, the price is acceptable on the basis of sound promote the "coal to gas" and central heating engineering, in district heating supply pipe network can not cover, vigorously implement the replacement of coal-fired power heating project.
Good job of marketing system storage capacity for natural gas. Accelerate the construction of natural gas transmission and distribution network, the new natural gas volume priority for life and severe winter areas of urban air pollution and coal for heating alternative. In principle, to new natural gas cogeneration and gas chemical projects.
Accelerate agricultural and pastoral areas "coal to electricity," the process of upgrading the power grid. Coordinate development of power transmission project construction, etc. are encouraged to promote the regenerative electric heating. Around on the "coal to electricity" project supporting grid should be given support, coordination "of coal to electricity," "coal to gas" land for construction.
In accordance with national requirements, shutting down environmental protection, energy consumption, safety and other 300,000 kilowatts coal-fired units of non-compliance. For shutting down the unit's capacity, coal consumption and emissions targets, allowed to trade or replacement, can co-ordinate arrangements for building the capacity of ultra-low emission coal-fired units.
According to air quality improvement requirements to accelerate the delineation of high-pollution fuel combustion zone ban and to expand the scope of, and actively promote the elimination of small coal-fired boilers. The county level and above urban area basically eliminated 10 tons of steam per hour and coal-fired boilers and tea furnace, stove and other operating coal-fired facilities, in principle, to 35 tons of steam per hour, the new coal-fired boilers, in principle, other areas on no new 10 tons of steam per hour of coal-fired boilers. While banned out of coal-fired boilers, pressure boilers market regulators cancellation of registration certificate to use.
Condensing boilers using issues to be addressed in recent years began to condensing boilers in new products for domestic use boiler, condensing boiler suits my policy standards promulgated by the state, then the use of the process, we also encountered some problems that must be addressed, Xiao Bian summarized as follows: 1, condensing boilers do not adapt to some of the high-temperature system for low-temperature radiant floor heating. 2, condensing boilers require specially designed temperature control system and debugging equipment. 3, the condensed water generally has a slightly acidic, corrosion resistance is required ferritic stainless steel, austenitic stainless steel, aluminum and the like; 4, annual operating time equivalent assessment of investment and recovery period; 5, the condensed water and recycling emissions. 6, power can not be too small, there will backfire, causing an explosion, corrosive wall. (Recommended to choose the power of 35 kilowatts and above)
Low Maintenance Cost:Very reliable as the only moving part is the fans which are outside the hot zone.
Coal fired steam boiler Capacity selection