china natural gas fired steam boiler
1 type: SZS D type Horizontal firetube china fired steam boiler
WNS oil gas fired horizontal steam boiler
2 t 2 t introduce gas boiler gas boiler burner arranged good technical performance, the use of automatic combustion ratio adjustment, automatically adjust the water supply, the program start and stop, automatic operation and other advanced technology, and having a low water level and low level alarm, high . steam pressure, turn off automatic protection function of the boiler has a compact, safe, reliable, simple, rapid installation, low pollution, low noise, high efficiency features: 2 tons of gas china fired steam boiler with a leading domestic level, and industry compared to the same parameters of the boiler, with a compact, power, fast boosting, high thermal efficiency. Advantages: use all wet back shell type pyrotechnic tube structure. This structure because of its compact structure, small footprint, originally applied in the marine boiler. This architecture uses three return, the oil mixed with air or gas well through the atomizing burner, complete combustion in the furnace in a corrugated, folded from the rear chamber into the first tobacco smoke return pipe to the front smoke box to the second return pipe tobacco, cigarette box, is discharged after the last to enter the chimney.
SUMMARY gas china fired steam boiler maintenance gas boiler twice monthly maintenance inspection item A. Fuel supply line: a filter cleaning gas oil; ignition gas conduit 2 airtightness inspection; 3 checks whether the flow line... B. inspection of the instrument: a flushing water table; 2 Syphons flushing; valve experiment. C. Check burner:.... The flame detector (photocell) cleaning the light receiving surface; second inspection oil pump pressure is normal; 3 checks the combustion flame is normal; 4 check burner, the burner sound is abnormal; 5 Cleaning revolutions cup; 6 o'clock washing water rod. . Check D. Intake system: a washing water filter; 2 reaches rated pump head and flow; 3 a check valve is working properly... E. daily drainage tank and the cleaning debris. Water quality testing, water testing furnace. F. Check the combustion consumption is normal. Every three months in addition to the maintenance items plus the inspection item inspection items: Electric Part A: 1 line is loose aging, failure; 2 check the reliability of electrical components, overload; Protection relay 3 is normal; B.... open soft low deactivation tank valve exclude sludge; C to test the boiler and then point interlocking means: 1. low water position; overpressure 2; 3 flameout 4. The exhaust gas temperature ultrahigh; D. et quality tobacco. detection: analysis of tobacco smoke constituents comprising temperature detecting tail, combustion is working properly checked. E. burner and boiler cleaning outer cleaning. Paul A. large projects each year hosts a body part of a comprehensive clean-up tobacco pipes, water pipes, front and rear smoke box, part of the furnace and the burnout chamber and smoke tubes ash collection. 1. inspection openings comprehensive inspection hole hand hole, manhole sealing soundness, and timely replacement of defective seals. 2. The overall comprehensive testing instruments, valves, comprising detecting pressure gauge and safety valve, the pressure controller and the electrode level controller tuning. Part B. burner: Burner cleaning turn round cup, ignition means, filter, pump, motor and impeller systems, throttle link means to add a lubricant. Re-awarded for combustion testing. C. access control section detecting electrical components, control lines, the control box clean ash collection, each control point is detected. D. water supply system maintenance water treatment plant to check whether water quality standards, a comprehensive clean soft water tank, to check the functioning of the pump and lift, clean check valve spool and so on.
Recently, the Xinjiang region issued on the overall strengthening of environmental protection and resolutely fight pollution prevention tackling embodiment, the program provides: Complete with ultra-low emissions and energy-saving transformation of the conditions before the end of 2020, coal-fired power plants. Gradually shutting down key areas do not have the conditions for the transformation of highly polluting coal-fired power plants.
Implementation of the program focus on the regional party committee, "1 + 3 + 3 + reform and opening up" work arrangements, accelerate the construction of ecological civilization system to ensure that by 2020 the basic layout of the formation of the main functional areas, land space development pattern was further optimized, the total emissions of major pollutants and the amount of energy consumption per unit of GDP dropped significantly, significantly reduced the number of heavy pollution days. Specific indicators: the region of fine particulate matter (of PM2.5) concentrations of the standard level cities not decrease by 15% in 2015, the level of urban air quality days ratio reaches 71.6%; good monitoring of river water quality of the region (or superior to class III) ratio of not less than 97.6% (national quality evaluation section 47 excellent no less than 91.5%, worse than Grade V ratio of not more than 4.28%), focus on monitoring water quality of lakes and reservoirs of not less than 71%; sulfur dioxide , nitrogen oxides, chemical oxygen demand, reduce ammonia emissions into the 2015 3%, 3%, 1.6%, 2.8%; contaminated land safety utilization rate of 98%, contamination of land utilization is not safe less than 90%; the red line accounted for ecological protection area of not less than 25%; forest coverage rate reached 5.6%.
Program has clearly pointed out, we must strictly control the total coal consumption, accelerate the use of clean energy alternatives. Study the development of the region's total coal consumption embodiments and independence - - "Kui" Ukraine - - Chang stone "of the total area of coal consumption Ukraine" reduction plan, the implementation of the target responsibility management, controlling the total coal consumption. Delineation work carried out high-pollution fuel combustion zone ban, ban the sale in the region ban on burning, burning high-polluting fuels. Increasing the use of clean energy, clean energy consumptive broaden the channels, the implementation of policies for renewable energy generation full protection of the acquisition. Promote clean low-carbon energy sources priority access. Encourage waste heat, shallow geothermal and other clean energy sources for heating. Strengthening the CBM (coal gas) utilization, in an orderly bulk coal in key areas of governance, the implementation of biogas projects.
The implementation of comprehensive improvement of coal-fired boilers. The promotion of clean and efficient coal-fired boiler, strict implementation of coal-fired boiler emission standards. The region above the county level cities and built-up area basically eliminated 10 tons of steam per hour coal-fired boilers and furnaces and tea, operating the stove, grain storage and drying equipment, coal-fired facilities, in principle, to a new 35 tons of steam per hour coal-fired boilers, in principle, to the rest of 10 tons of steam per hour, a new coal-fired boilers. Ambient air quality did not meet the city should increase efforts to eliminate further. Key areas basically eliminated 35 tons of steam per hour of coal-fired boilers, 65 tons of steam per hour and above all coal-fired boilers to complete the transformation of energy-saving and ultra-low emissions; low nitrogen gas boiler basically completed the transformation.
In the region the implementation of ultra-low emissions and energy-saving coal-fired power plants, encouraging "Wu - Chang - Stone" to carry off white smoke fired power plant pilot area. Before the end of 2019 to complete the "Wu - Chang - stone" "Kui - ultra-low emissions and energy-saving black" area, and Korla Ili River Valley and surrounding areas with the transformation of the conditions of coal-fired plants, in other areas before the end of 2020 - only carry out. Gradually shutting down key areas do not have the conditions for the transformation of highly polluting coal-fired power plants.
Over the next three years, the Xinjiang region will strictly implement the Plan of Action to win the Battle of Blue Sky, "the Wu - Chang - stone" "" Kui - alone - Ukraine "and other key areas as the main battlefield, promote industrial structure, energy structure, transport structure adjustment and optimization, strengthening regional joint prevention and control measures to deal with weather and heavy pollution, further clarify reduce the concentration of PM2.5, and significantly reduce the number of heavy pollution days, significantly improve air quality, enhance the blue sky happiness of the people make unremitting efforts.