gas vertical steam boiler
Talk about the overall structure of the furnace boiler boiler boiler and auxiliary equipment, including two parts. Boiler furnace, drum, burner, water wall superheater, economizer, air preheater, and the furnace wall, etc. The main frame member constituting the core part of the steam production, called boiler. Boiler body is in two main parts and drum furnace. Today, we are concerned that the furnace boiler. Also known as boiler furnace combustion chamber, fuel combustion for space. It solid fuel on to the grate, referred to as a fire bed combustion furnace Stoker, also known as the fire-bed furnace. Solid fuel liquid, gas or pulverized, is injected into the furnace fire chamber may be referred to as a combustion chamber of the burner, also known as the furnace fire chamber. The coal particles and air hold it was boiling point of combustion, the furnace and adapted called inferior fuel combustion fluidized bed furnace, known as a fluidized bed furnace. An air flow so that the coal particles rotated at high speed, and strong burning furnace called cylindrical cyclone furnace. Boiler furnace cross-section is generally square or rectangular. Combustion fuel to form a flame in the furnace and high temperature flue gas, so the hearth around the furnace wall is made of refractory material and insulation material. On the inner surface of the wall of the furnace waterwall tubes often laid, it will not burn both protect the furnace wall, and absorb a large amount of radiation heat of the flame and the high temperature flue gas. In addition, the furnace design needs to fully consider the characteristics of the fuel used. Each boiler should be fueled with the original design of the fuel. Boilers running economy and reliability are likely to vary greatly reduced when using the characteristics of fuel combustion.
Steam boiler configuration and price performance advantage of fast boiler vertical steam boiler is a new technology based on conventional steam boilers, improved from the depth of research and development, superior work performance is more stable and energy-saving, comprehensive ability to work the next level, in recent years, is also a very popular steam boilers, steam it can meet the operational needs of most users, popular with users. The new integrated operation of the new steam boiler steam boiler performance is relatively stable, at work, saving and environmental protection, as well as the amount of steam long run all have good performance. Low energy consumption, low cost using 220V household electrical lighting, the total electric power does not exceed 1.5KW, about 3 minutes at room temperature the water vapor, efficient energy saving. For a wide range of new steam boiler Application: Washing Ironing industry, food processing industry, packaging machinery industry, bio-chemical industry, and so the high degree of automation with full touch screen smart intelligent control, a key to start without special guards, overpressure display, water display, temperature display, the display timing of other functions. Efficient use of energy saving integral mounting machine, factory installation is completed, Built Preheater, first use is not completely absorbed by the flue gas waste heat to heat water at room temperature, having a low exhaust gas temperature in line with the national emission standards. If new and existing steam boiler steam boiler operating parameters do not meet your production conditions, you can also choose to communicate with manufacturers to discuss, select tailor-made, custom manufacturing model is suitable for your needs. Fast boiler heat equipment has accumulated years of production experience, thousands of users to solve production problems, free of charge for many users tailored production program, subject to a number of users, more relevant information if you want to get quote or to learn more, you can call us or click on the online consultation, free 24-hour staff will answer your questions!
SUMMARY gas vertical steam boiler maintenance gas boiler twice monthly maintenance inspection item A. Fuel supply line: a filter cleaning gas oil; ignition gas conduit 2 airtightness inspection; 3 checks whether the flow line... B. inspection of the instrument: a flushing water table; 2 Syphons flushing; valve experiment. C. Check burner:.... The flame detector (photocell) cleaning the light receiving surface; second inspection oil pump pressure is normal; 3 checks the combustion flame is normal; 4 check burner, the burner sound is abnormal; 5 Cleaning revolutions cup; 6 o'clock washing water rod. . Check D. Intake system: a washing water filter; 2 reaches rated pump head and flow; 3 a check valve is working properly... E. daily drainage tank and the cleaning debris. Water quality testing, water testing furnace. F. Check the combustion consumption is normal. Every three months in addition to the maintenance items plus the inspection item inspection items: Electric Part A: 1 line is loose aging, failure; 2 check the reliability of electrical components, overload; Protection relay 3 is normal; B.... open soft low deactivation tank valve exclude sludge; C to test the boiler and then point interlocking means: 1. low water position; overpressure 2; 3 flameout 4. The exhaust gas temperature ultrahigh; D. et quality tobacco. detection: analysis of tobacco smoke constituents comprising temperature detecting tail, combustion is working properly checked. E. burner and boiler cleaning outer cleaning. Paul A. large projects each year hosts a body part of a comprehensive clean-up tobacco pipes, water pipes, front and rear smoke box, part of the furnace and the burnout chamber and smoke tubes ash collection. 1. inspection openings comprehensive inspection hole hand hole, manhole sealing soundness, and timely replacement of defective seals. 2. The overall comprehensive testing instruments, valves, comprising detecting pressure gauge and safety valve, the pressure controller and the electrode level controller tuning. Part B. burner: Burner cleaning turn round cup, ignition means, filter, pump, motor and impeller systems, throttle link means to add a lubricant. Re-awarded for combustion testing. C. access control section detecting electrical components, control lines, the control box clean ash collection, each control point is detected. D. water supply system maintenance water treatment plant to check whether water quality standards, a comprehensive clean soft water tank, to check the functioning of the pump and lift, clean check valve spool and so on.
We have long known that fast boiler this brand, high-tech enterprises in Henan Province, the most influential brand, technology entrepreneurs contribution to enterprise and many other honors, so that our brand is very interested in each other fast. Through this collaboration, proving once again that our decision is not wrong, 15 tons of steam condensing gas boiler provides steam to fully meet the needs of our dairy products processing plant. --customer feedback