coal fired sinlge drum chain grate hot water boiler
Pressure boilers Products of the non-pressure coal fired sinlge drum chain grate hot water boiler, also called pressure boilers, boiler usually refers to the top does not bear the water column static pressure of the heating system. That is quite an open hot water tank. Meaning pressure boiler: boiler body opening to the atmosphere. In any conditions, the boiler at the water line are zero gauge pressure boiler. Pressure boilers Model consists of three parts, connected by a hyphen between the parts. Categories: pressure hot water boiler is mainly classified by fuel can be divided into CLDR (CWDR) often piezoelectric hot water boiler, CLHS-YQ (CWNS-YQ) pressure fuel (gas) hot water boilers, pressure coal-fired hot water boilers. Model: The first part of the model by atmospheric pressure boiler code, pot-type code, combustion equipment code, the rated thermal power four sections. Boiler pressure is represented by C code example: CLSG0.35; 95/70; W12 represents a vertical pipe fixed grate boiler pressure, the rated thermal power of 0.35 mW, rated outlet water temperature was 95 deg.] C, the nominal temperature of the water inlet. 70 ℃, burning anthracite class I, a second design of the boiler. Product Structure: The overall structure of pressure boilers and boiler auxiliary equipment including two parts. Boiler furnace, drum, burner, water wall superheater, economizer, air preheater, and the furnace wall, etc. The main frame member constituting the core part of the steam production, called boiler. Boiler body is in two main parts and drum furnace. Also known as the furnace combustion chamber, fuel combustion for space. The solid fuel on to the grate, referred to as a fire bed combustion furnace Stoker, also known as fire bed furnace; solid fuel furnace liquid, gas or pulverized, is injected into the combustion chamber is called the fire chamber burner, also known as the furnace fire chamber; air coal particles burn hold it was boiling, and the furnace is inferior fuel suitable for combustion is called fluidized bed furnace, also called fluidized bed furnace; coal particles so that an air flow rotated at high speed, and strongly called fire cylindrical cyclone furnace hearth. Furnace design needs to fully consider the characteristics of the fuel used. Each boiler should be fueled with the original design of the fuel. Boilers running economy and reliability are likely to vary greatly reduced when using the characteristics of fuel combustion. And the natural circulation drum is repeatedly forced circulation boiler receiving feedwater to the economizer, the coupling cycle and supplying saturated steam superheater cylindrical vessel. Simplified drum made from high quality steel plate, is one of the heaviest components of the boiler. Safety knowledge; boiler is a high-temperature, high-pressure thermal equipment, is one of special equipment, widely used in government agencies, public companies and all walks of life, are dangerous and special equipment. Event of an accident involving public safety, it will cause huge losses to the state and people's lives and property. For public safety, people's lives and property safety, according to the State Council, "Regulations on Safety Supervision of Special Equipment", the boiler should use full attention the following matters: 1, should be accompanied by safety technical specifications of the factory boiler design documents, product quality certification, safety and the use and maintenance instructions, supervision and inspection certificate (safety supervision, inspection and performance certificate). 2, boiler installation, maintenance, alteration. Engaged in the installation of the boiler, maintenance, renovation of the unit shall obtain special equipment installation and maintenance certificates issued by the Provincial Quality and Technical Supervision, before engaging in the boiler installation, maintenance, alteration. Construction unit before construction will be prepared for installation, maintenance, alteration in writing inform the special equipment safety supervision and management department of the municipality or district, and will start informing sent to the local county level Quality and Technical Supervision for the record, told immediately after construction. 3, inspection of boiler installation, maintenance, transformation. After construction, the construction unit To State Quality and Technical Supervision of Special Equipment Inspection and hydrostatic testing of the boiler installation supervisory inspection declaration. After passing by the State Quality and Technical Supervision, State Special Equipment Inspection, County of Quality and Technical Supervision involved in overall acceptance. 4, registration boiler. After the boiler inspection, the use of units must be in accordance with the "special equipment registration and use of management rules", fill "boiler (census) Registration Form", the State Quality and Technical Supervision to register and obtain a "registration certificate to use special equipment safety . " 5, operation of the boiler. Boiler operation must be performed by trained and qualified to obtain "special equipment operator certificate" certified personnel to operate, must strictly abide by the rules and eight systems, six record. 6, check the boiler. Periodic inspection of boiler once a year, not be used without safety periodic inspection of boilers. Safety accessories safety valve of the boiler regular inspection once a year, pressure gauge biannually verified, may not be used without the periodic inspection of the safety accessories. 7, non-pressure boilers will be installed for the boiler pressure. Do not use water level gauge, safety valve, pressure gauge three safety accessories insufficiency boiler. Daily operation and maintenance: ⒈ chemical contact, turbine attendant prepare enough desalinated water, oxygen, water passing temperature no higher than the drum wall temperature 50 ℃; Sheung during hot water temperature should not be to the drum wall metal temperature difference greater than 40 ℃ .⒉ new installation or after recording before overhaul boiler Feed expansion departments indicated .⒊ Sheung summer time less than 2 hours, at least 4 hours in winter, when the temperature and Sheung drum wall temperature difference of less than 40 ℃ how reheater be preserved? ⒈ turbine after playing brakes, boilers ensure a blower, an induced draft fan is running the best cross reserved two oil gun .⒉ open reheaters to the empty exhaust steam reheater hydrophobic doors and air doors corrosion, anti-corrosion of the reheater steam temperature is lower than a predetermined deg.] C for 400 .⒊ control drum water level within the permissible range .⒋ preservation time less than 20 minutes after stopping two oil gun operation guaranteed .⒌ when the furnace pressure 50--100Pa, each of the flaps open, baffle for ventilation less than 5 minutes, stop sending, fan, each of the flaps closed tailgate may be appropriate to accelerate Sheung speed.
In late May 2018, Hedong District, Tianjin Environmental Protection Bureau, the District Construction Committee, District Bureau for approval jointly held low nitrogen gas boiler reconstruction work will push for the Municipal Environmental Protection Bureau atmosphere at the meeting of May 18 Air pollution control work in progress briefing involves the transformation of low nitrogen gas boiler, convey the contents of the meeting and introduced the progress of work and experience low nitrogen gas boiler reconstruction of other counties.
Clear four key tasks meeting: First, all gas boiler units must be in accordance with the time node, complete technical solutions before the end of May to develop and expert appraisal work;
Second, according to the requirements of the minutes of the 49th executive meeting of the district government, the units shall, not later project work next week to start the project, and accelerating project bidding, project construction to ensure completion before the end of September;
Third, the units should seriously accordance with the "Municipal Environmental Protection Bureau of Finance on the issuance of Tianjin Gas boiler low nitrogen fixed subsidy reconstruction project implementation approach" (environmentally friendly gas-chun [2017] No. 171), "on the issuance of Tianjin Municipal Environmental Protection Bureau letter fixed subsidy acceptance requirements of low nitrogen gas boiler reconstruction project "(Tianjin environmental Protection memo No. [2017] 406) and" Municipal environmental Protection Bureau Municipal market supervision Commission letter of relevant work requirements transformation of low nitrogen gas boiler "(Jin Han [green gas the relevant procedures 2018] No. 92) requirements, preparing project application and acceptance, with particular attention to security issues in the process of transformation of the project, to ensure that emissions meet the standard requirements after the transformation;
Water tube boiler HRSG
With the high cost and environmental impact of fossil fuels, heat energy is a precious commodity that cannot be wasted. ZG Boiler is a manufacturer of waste heat recovery systems for the following markets: Biomass & coal cogeneration systems, waste heat recovery systems, power plant boiler systems.
15 tph SZL coal-fired water tube boiler project for gelatin industryNTP Gelatine Pvt. Ltd., established in 1957, is a leading gelatin manufacturer in Pakistan. In the manufacturing process of gelatin, plenty of high-quality steam is needed in extraction, concentration and drying, therefore, one set of steam boiler with sufficient output and high quality is critical to the production line. The previous coal-fired steam boiler of NTP Gelatine Pvt. Ltd. had a considerable impact on the production due to inadequate combustion and insufficient combustion, so the company decided to reorder one set of efficient coal-fired steam boiler. ZOZEN coal-fired boilers have outstanding advantages in product design, quality and performance, which were highly appreciated by NTP Gelatine Pvt. Ltd. ZOZEN sales manager conducted a field investigation to inspect the actual working conditions and provided a set of 15 tph SZL series coal-fired water tube boiler. This series of boilers has wide fuel adaptability, and is suitable for many types of coal including bituminous coal, lean coal, anthracite and lignite. In addition, it is equipped with different amounts of independent wind barns according to different evaporation capacity, by which users can adjust the wind supply to ensure the complete combustion on the basis of the type of coal and combustion conditions. Meanwhile, ZOZEN also customized feed system, slagging system and tail flue gas treatment system to increase the economic benefits in highest degree.