2000Kg Gas Fired Vertical Steam Boiler
Which Xining Xining industrial boilers industrial boilers looking to find Which? There are a lot of companies need to produce industrial boilers in Xining area, industrial boilers had previously been dominated by coal, but now the purchase of multi-boiler is gas-based. This is also in line with the requirements of the current environmental policy. For the procurement of industrial boiler business, then Xining region, for businesses can be compared within the boiler manufacturers nationwide. The company Xining After initial screening decision Xianxiang fast boiler manufacturers for consultation. In this regard, fast boiler manufacturers for the accounting data for the current production status of the enterprise Xining, concluded that the plant with 1 table 6 tons of industrial gas 2000kg fired vertical steam boiler on it. Initially, the company for the transport of Xining boiler still have concerns, however, listened to a detailed introduction side boiler fast personnel of the relevant technology. Completely dispel concerns. At present, the price of the model of industrial steam boiler at around 720,000. Recently, the Xining to fast Boiler companies will conduct field investigation, will talk about specific issues related to time after purchase.
At present several common boiler energy-saving technologies: usually for boiler manufacturers, it means that you are saving boiler to maximize the interests of customers, providing customers with unlimited fuel savings, the electricity consumption, water consumption and so on. But the wide range of energy-saving, does not refer to an aspect of optimization can save energy boilers, here's a look now common boiler energy-saving technologies: 1 furnace arch. Industrial boiler furnace arch is very important. Arch role is to cause the furnace hearth and the organization of the mixed gas and the radiation hot flue gas flow, ignition and combustion of the fuel in a timely manner. At present, the actual amount of industrial 2000kg fired vertical steam boiler with its rated load often do not match, the use of coal varies widely, but often with the design coal are quite different, so in actual use, often as necessary for the furnace arch modified to meet the needs of coals. Heteroaryl coal used by the inferior design coal, the boiler furnace exit gas temperature occurs is low (about 700 degrees), lower than 200 degrees design.
Gas pressure hot water boiler pressure introduction gas hot water boiler: gas pressure hot water boiler pressure vessel belongs, as always pressure hot water boiler is full of water, so no water level, but to be fitted with pressure gauges, safety valves and thermometers. Circulating pump pressure hot water boiler heating system is generally used in water pump, which is pumping systems engineering backwater sent to the boiler, it is necessary to overcome the resistance of the systemic circulation, but also to maintain a certain pressure boilers, hot water does not guarantee high temperature vaporization . Pressure hot water boiler can not only supply low-temperature water, but also to supply hot water Features: 1, boiler design, manufacturing, supervision and inspection are strictly according to "hot water boiler Safety Supervision" ensure long-term security and stability of the boilers. 2, the boiler body is a shell type three return all wet back downstream pyrotechnic pipe structure, large combustion flame in combustion chamber a slight positive pressure, combustion heat load is low, less NOx emissions of harmful substances. Through advanced machine test bed to test several times to verify the boiler under various load operation can get good thermal performance, qualified flue gas emissions targets as well as a wide range of burner adapter. 3, before and after the boiler smoke box with a special heat insulation materials, high temperature, low thermal conductivity, good anti-radical quenching heat capacity, greatly extending the life of the smoke box. A lower smoke box is provided with a condensate drain, water condensed reduce corrosion of the pressure receiving member. 4, the boiler and each pot spout means disposed reasonable to optimize the pot water circulation, prevent scale generation, but also help to improve the water side heat transfer. Set hand hole, inspection hole in the poor circulation of weak links, to facilitate regular inspection and maintenance. 5, the temperature of the boiler smoke box structure compared to dry wet back boiler back, greatly reduced, the smoke box solves the frequent need to maintain the operation of the phenomenon; 6, a large volume of water boiler design, the load fluctuation of furnace not sensitive to large changes in the load range of users still apply. 7, industrial boilers professional artists and designers carefully designed appearance, novel and unique and yet with the surrounding environment coordination. Sino-Swiss boiler completely changed the image of heavy industrial boilers, industrial boilers is a new concept of low-carbon twenty-first century. Construction and installation points: 1 explosion-proof door is provided on the fuel, the rear of the gas-fired boiler or pipe smoke, explosion door location should be conducive to explosion venting. For gas explosion likely to endanger the safety of the operator occasions, should be installed on the guide tube pressure relief blast doors. 2. Installation of boiler and its auxiliary equipment, water treatment equipment should meet the technical requirements of the device manufacturer. Equipment foundation must be the arrival of equipment and after verification and design drawings before construction. 3. When mounting the device, the device should be avoided, to install the floor material are collected together. Column using a construction, the beam lifting device, must first verify that the carrying capacity of the beam, the column. 4. After the pressure test acceptance oil, gas, water, steam pipe installation, according to "Industrial metallic pipeline construction and acceptance" in GB50235-1997. The main construction practices and node configuration detail see National Building Standard Design Atlas. 02R110 "Gas (oil) boiler room engineering design and construction Atlas" 02R111 "small vertical, horizontal tank Atlas" 02R112 "Tank dome Atlas"
To further reduce emissions, improve air quality, the Shanghai Municipal Government put forward the views of accelerating the implementation of small and medium sized boilers mentioned standard transformation of the urban area. Details are as follows.
As of 2020 before the end of September, the city mentioned standard transformation is completed with small boilers. Among them, the city center before the end of 2019 to complete the transformation mentioned standard, to Shanghai, "Boiler Air Pollutants Emission Standards" (DB31 / 3872018) requirements, to encourage compliance in advance.
In January 2018 - September 2020 period, complete boiler mentioned standard transformation and acceptance, discharge standards under the "50%, 75%" and other major conditions of the city's small and medium-load boiler unit.
City, District, together, support the implementation of fiscal policy. Giving special one-off subsidies, municipal and district levels in line with the financial support of the above-mentioned range. Specific binding transformation of the former boiler capacity and completion time, be supported in accordance with the following criteria: