Low Pressure 1500Kg Electric Steam Boiler
Steam boilers for industrial production of stable and high-quality delivery of steam, wide range of applications. Depending on the fuel, coal-fired boilers can be divided, biomass boilers, gas-fired, oil-fired boiler and an electric boiler.
Difference fast boiler steam boiler steam boiler is a steam boiler with ordinary steam production machinery and equipment, in general the use of coal, gas or coal as a fuel, there are an low pressure 1500kg electric steam boiler. Fast boiler for the inspection of the steam boiler is a steam boiler using coal, oil, gas, and it is common conventional steam boiler with the following differences: "steam boiler supervision norms" and the forthcoming introduction in June next year the new pot rules " boiler safety technology to monitor the specifications "are clearly defined steam boiler needs to be regulated by the state. In other words, users looking to buy a steam boiler plant boiler installation and can not be used directly. Before installation To pot seized by the approval and registration required for installation, and the need for inspection on a regular basis, usually one year during the annual inspection. But there are some of the steam boiler does not require registration and annual inspection, the old rules and the new pan pot regulations stipulate a water capacity less than 30L steam boiler is not within the scope of the surveillance. Because the water capacity of 30L water capacity than at home with a water heater are also small, so there is no risk of explosion, we do not need supervision. Water capacity fast boiler steam boiler 26L, belonging to the steam boiler does not require regulation. Steam boiler explosion hazards generated is amazing. In many steam boiler explosion in the boiler room were razed to the ground, the annual explosion of a steam boiler will be the first to cause casualties and significant economic losses. Fast boiler steam boiler is to achieve the ultimate in security, the boiler body through the scientific design, water capacity is very low, only 26L, itself, there is no risk of explosion. The thermal efficiency of conventional steam boiler, only about 80%, while the thermal efficiency of the fast boiler gas steam boiler can reach more than 93%. Plus system energy saving control system for boiler fast side, the actual energy savings up to 30%, running down a year could save hundreds of thousands of operating costs. The fast boiler steam boiler without boiler room, an area itself is small, you can put in the basement or roof, it can also be placed directly next to the device requires the use of steam. Saving the cost of laying pipe network construction costs and the boiler room, a significant reduction in the use of the initial investment.
Maintenance fuel gas boiler: the oil furnace shutdown furnace to be cooled to below 70 ℃ water to boiler water exhausted, the internal completely remove the dirt, washed away, all manholes, hand holes, pipe valves tightly blocked, and treated with blind plate and the steam boiler operation completely isolated. After all of the alkaline solution is added, and then injected into the soft water boiler, until the water coming out from the highest point till the boiler, the water supply valve is closed, note that the average mixing an alkaline solution inside the boiler. Shutdown more than one month should be maintained using a dry method, the following can be wet shutdown heart month regimen. To schedule the maintenance period Microflame oven, schedule the water cycle, the concentration of the alkaline solution throughout the same. Every five tests also take a basic solution, such as alkalinity less than 5-12mmol / 1 solution should be applied. Periodic inspection outage before the boiler furnace, should be prepared to work the following three aspects: (1) review boiler furnace registration technical dossier and understanding of the transformation of the electric furnace boiler usage. In order to achieve the transformation of the electric furnace boiler external inspection within the time aware of the general need to understand: the transformation of the electric furnace boiler design, manufacture, installation; boiler furnace revamping; boiler furnace use history and usage; boiler furnace water treatment situation; implementation of the boiler and other rules and regulations. (2) Check before shutdown preparation. First, with the production schedule maintenance shutdown date, and then let the transformation of the normal furnace boiler shutdown program shutdown, but slowly disheartened. Injecting cooling method may be employed downcast water, replacing the water cooled furnace and the furnace into line ventilation cooling. When the boiler water temperature was reduced to 70 ~ 80 ℃, before drainage. Open all doors hole. When the door opened, to prevent warm water, steam jet man suddenly burns. Corresponding to the passage blocked pipe on the transformation test furnace boiler steam, water supply, sewage and other pipes and other run in the transformation of the electric furnace boiler. Blocked with shutter have sufficient strength to avoid being broken drum high pressure medium. To clear the blocking position is indicated. And other operational boiler furnace flue should be communicated reliably cut off.
Anyang City Power Supply Bureau as a unit in charge of the sale of electricity in Anyang City, in the choice of the boiler is more cautious. Based on our understanding and trust, choosing our split condensing steam boiler. Anyang Power Supply Bureau responsible person to us feedback, provide fast side of the boiler with the rest assured, product design everything, we believe that the fast side of the boiler can be used for more than 10 years and even 20 years. --customer feedback