gas heating water tube steam boiler seller
Successful ignition of fuel heating water tube steam boiler seller can not run, because of those common oil gas powered steam boiler applications, all of you should ignite the fuel steam boiler in the application process, no way ignition is also the most common problems. Fuel steam boiler in the application process, most likely resulting in no way ignition, resulting in fuel steam boiler can not run normally, small series to introduce you to a steam boiler does not ignite the fuel to run those common reason. Fuel steam boiler can not run common ignition of those reasons: First, the ignition problems: pulse ignition and control systems such as the one of which has caused the problem, the fuel steam boiler can not start. Second, the battery thing: to be very important to see if the battery is a battery in the end is not too aging. The charge is not standard, the same can not let steam boiler fuel ignition. Third, the water pressure thing: at the inlet steam boiler fuel filters block the formation of water can not flow normally through the clean up clean ok. Fourth, the pulse valve problems: If the boiler ignited fuel vapors to ignite division saw sound, no pulse valve "despair" squeak, probably for the pulse valve is damaged or degraded, pulse valve degeneration, will not manipulate, the beginning of the ignition operation when closing a flow will hit a fire, but the fire immediately and confinement; pulse valve before confirm whether there is a problem to confirm whether normal ignition actuating member, if the fault can not pull the valve actuating pulse. V. ignite feelings needles or needle thing: fuel steam boiler ignited hand shift. You can change or correct the ignition pin arrangement; if feelings of degradation promise things, as long as the feeling wiped clean arranged on it. Six, usually no way to exhaust smoke tube. Smoke tube steam boiler with a fuel block, clean breathing tube blockers smoke tube is too long, the configuration is not correct. Referring may be configured to inform two coaxial cigarette heater tube. VII vapor setter joint problems: fuel steam boilers, water vapor degradation intimal flap valve or joint damage, not the weak control push button switch; weak bad control switch button.
Technical features of WNS boiler
The WNS boiler produced by ZG boiler is a oil and gas boiler, which can be divided into WNS oil and gas hot water boilers and WNS oil and gas steam boilers, and is also a well-developed hot boiler by ZG boiler. The technical features of this boiler are as follows:
1. The WNS oil and gas boiler adopts a large-volume combustion chamber design, so that the fuel is fully burned and the flame fullness is good. Good for low-nitrogen combustion of fuels and low nitrogen emissions from flue gas.
2. The WNS oil and gas boiler uses an automatic low nitrogen burner + flue gas recirculation system (FGR) system to achieve ultra-low nitrogen emissions.
3. The WNS oil and gas boiler adopt advanced wave furnace structure, which not only increases the heat transfer area, but also satisfies the free expansion of the furnace after heating. At the same time, the waveform furnace structure enhances the disturbance of the flue gas and enhances heat transfer and combustion.
4. The rear of the boiler body is equipped with an energy saver and a condenser, which can effectively reduce the temperature of the exhaust gas and improve the overall thermal efficiency of the boiler. The condenser adopts "low temperature corrosion resistant" special steel to greatly increase the service life.
5. The oil and gas boiler adopts a wet-back structure and full-flanged butt welds with high reliability and low maintenance costs.
6. The use of threaded tobacco pipes in the WNS oil and gas boiler is beneficial to enhance airflow disturbance and enhance heat transfer.
7. The WNS oil and gas boiler outer packaging adopts color pattern board, mirror stainless steel or matt stainless steel board in three forms, beautiful and generous.
8. Automatic operation of the WNS oil and gas boiler, micro-positive pressure combustion, no need to draw fan, reduce boiler system investment, reduce boiler operating costs.
9. The WNS oil and gas boiler equipped with necessary thermal instruments, valves and various protection devices, to achieve continuous electric water regulation, automatic water level control and high and low water level alarm, low water level chain protection and other functions, automatic control of steam pressure and overpressure alarm and other functions.
Classification and distinction and design a gas boiler, gas boiler gas boiler classified in accordance with the fuel can be divided into natural gas boilers, boiler city gas, coke oven gas boiler, liquefied petroleum gas boilers and gas boilers; according to the function can be divided into gas boiler water , gas hot water boiler (gas heating boiler comprising a boiler and bath gas), gas heating water tube steam boiler seller and the like; can be divided according to the structure of vertical gas boiler, gas boiler horizontal; in accordance with the process can be divided into a single flue gas boiler and tris backhaul backhaul gas-fired boiler. Second, the difference between fuel oil-fired boiler fuel boilers and gas boilers is fuel (such as diesel, oil, kerosene, etc.), fuel gas-fired boiler to gas (such as natural gas, city gas, biogas as well as liquefied petroleum gas, etc.), depending on the boiler What fuel burning device called a burner, boiler gas burner configuration called gas-fired boiler, oil boiler burner configuration called oil-fired boiler, oil-fired boiler and gas boiler difference is that what fuel burners. Third, the design of the boiler furnace by the gas boiler structural design pressure, provided through the top of the large pores, the boiler operates at atmospheric pressure, away from the danger of explosion; boiler furnace using computer simulation to optimize the design, the size of the boiler is fully optimized, so that coordination and beautiful form. Vertical-mounted boiler combustion at the burner, combustion of the fuel within the positive pressure furnace, baffle interposed smoke tube, slow smoke evacuation rate, to strengthen the heat exchanger, the heat furnace to ensure maximize fuel combustion water, improving the thermal efficiency of the boiler; horizontal wet back boiler full three pass structure, the length of the flue gas flow, reducing exhaust gas temperature, the whole corrugated furnace provided, so that the flame produced a strong turbulence to improve the heat transfer coefficient strength, and effectively It is prevented due to thermal expansion and contraction of metal results in a reduction of the life of the device; smoke tubes of large diameter and large pore bridge the gap, the boiler at equal time scale coating thin and easy to clean.
Recently, Jinan City issued a "supplementary notice on accelerating the city's boiler-depth treatment of work-related" and formulated the following objectives.
I, on the in-depth treatment of boiler completion time. Low Nitrogen transformation and the transformation of the city's ultra-low emission gas-fired boiler biomass boiler to complete the appropriate time to relax, and strive to be completed in the end of June 2019, due to the commitment of heating (cooling) or involving people's livelihood and other support complex transformation process of the boiler furnace, indeed practical difficulties, completion time may be extended to the end of October 2019.
Second, on the in-depth treatment boiler standards. According to the "program tackling autumn and winter", the low nitrogen gas boiler after transformation, in principle, is not higher than the concentration of nitrogen oxides emissions of 50mg / m³, according to encourage the transformation of 30mg / m³. Encourage the transformation of biomass boiler with ultra low emissions coal-fired power plants.
Third, on the time-depth treatment of boiler arrangement. 2018 10 completed before the end inventory information verification, planning work; organize the implementation of the completion of the work before the end of May 2019; the end of June 2019 to complete the inspection work (due to heating and other disabled do not have to bear the acceptance conditions, available at the end of November 2019 before the completion of acceptance).
Fourth, on the information submitted to the work. Please ring the economy Zi [2018] No. 175 document complements the "Jinan City gas boiler investigation Summary Sheet" on or before October 12, "Jinan biomass boiler investigation Summary Table" to the Municipal Environmental Protection Bureau. On or before October 26, the "Jinan City Boiler depth management plan summary table", "Jinan hole sampling and sampling platform standardization construction unit summary table" and has completed the in-depth treatment of the boiler reconstruction proved supervisory monitoring report submitted to the Municipal Environmental Protection Bureau . Since the beginning of November, every Friday morning before 10:00 (for the first time submitted November 2) the progress of reform in-depth treatment of each unit case to the Municipal Environmental Protection Bureau.