5mw oil fired steam boilers
3.Heavy industrial applications burning gas, oil, refinery gas, hydrogen and off-gas fuels.
4.Higher thermal efficiency levels are possible,Less tolerance for water quality calls for water treatment plant.
5.With totally automatic burner and full set of safety protection device, thus automatic safety operation can be guaranteed.
6.The heat exchange surface area of the boiler and the space for water and steam are large enough to make sure the boiler parameters are stable.
7.The rear section of such boiler is equipped with flue gas condensing and recovery device which can effectively control exhaust gas temperature so that to improve boiler thermal efficiency.
8.Adopts high heat resistance material as adiabatic layer which brings a good thermal insulation property; the outer shell of the boiler adopts pressed guard board which makes the boiler looks delicate.
9.Adopts packaged structure; the whole boiler is fixed on the steel base with strong rigidity. Such structure provides convenience for installation and transportation.
How to maintain 5mw fired steam boilers 1, when maintaining boiler, must cut off the power supply, must release pressure. 2, burners should be removed from boiler body every two months, and other foreign bodies such as carbon deposit and dust should be removed seriously. The photo-electric tube is polished once a month. The fuel filter should always be cleaned and filtered. Carefully clean the inner filter screen of the oil pump and do not destroy the gasket. The burner shall not run without oil to prevent damage to the oil pump. 3, the water level gauge shall be kept clean at all times and rinsed once a day by opening the cleaning valve to ensure the water level is clear. 4. The safety valve shall be pulled once a day in case of rust failure. 5, When the steam boiler stops running for a long time The power supply should be cut off and the maintenance work should be done: (1) dry maintenance, discharging the furnace water after the furnace is stopped, rinsing away the dirt in the furnace, drying the pot with a small burner fire (the burning time should not be too long, so as not to damage the boiler), Then, after all the boiler gas has been discharged, all pipe valves will be closed and checked every three months. (2), wet maintenance shall be applied to boilers with a period not exceeding one month, and the boiler water will be discharged after the shutdown, and the clean and full water will be discharged. Cut off the power supply and close the valve.
There are a lot of oil refines in Pakistan. And Pakistan also has rich oil, petroleum and gas resource. Last week, we got an inquiry of 10 ton oil fired 5mw fired steam boilers from Pakistan. Our consumer kindly provided our lot of information about his requirements such as boiler capacity, boiler fuel, boiler pressure, boiler application, boiler temperature, oil refines condition, etc. Those information can save our time. And our consumer can directly receive specialized engineers advice. Our engineers is making plans for this oil refines project in Pakistan.
Recently, Wuhan City, introduced in 2019 to embrace the blue sky action plan for speeding up the optimization and upgrading of industrial structure, promote the optimization of energy structure adjustment, implementation of transportation restructuring, deepen industrial pollution control and other tasks proposed solution.
Among them, in terms of optimization and upgrading of industrial structure, we will study and formulate more stringent industry access threshold, no new heavy chemical and paper industry projects within 1 km of the Yangtze River and Hanjiang River shoreline. Strict implementation of ecological protection red line, the bottom line of environmental quality, resource utilization on the line, environmental access a list of constraints.
In optimizing the energy structure, the city's ban on new coal-fired generating units, supporting the construction of new projects is prohibited owned coal-fired power stations, will not be new coal-fired boilers. Increase efforts to promote green buildings, new buildings full implementation of green building standards. In deepening the industrial pollution control, referring to Beijing and Xi'an subsidies, launched a comprehensive transformation of low nitrogen gas boiler. Before the end of 2019, the district completed at least 50% of the area within the low-nitrogen transformation tasks 10 steam tons / hour or more gas-fired boiler.