5 mw fire tube water boilers dealer
The new boiler installation, you need to clean it? What steps Boiler specific needs? Newly installed boiler, it is required to do some work in order to start using. However, it is not clean, but rather cook stove, the boiler body in oil and other cleaned to prevent them appear soft drinks were vacated, in the course of this phenomenon problem. Further, in the oven cooking process, but also may cause the passivated metal surface, forming a layer of oxide film, thereby preventing the oxidation of the metal.
20th Meeting of the Standing Committee of People's Congress of the fourth Jinzhong City, approved the Thirteenth People's Congress Standing Committee of Shanxi Province, the seventh meeting since January 1, 2019 the formal implementation of the "Jinzhong City coal pollution prevention and control regulations "(the" Ordinance ").
1, Municipal People's Government shall determine the total amount of coal required control objectives, the development of coal-fired reduction and clean energy transformation plan and organize the implementation, reduce the proportion of coal in primary energy consumption structure in accordance with the requirements of the provincial government and city environmental protection.
2, Municipal People's Government shall designate built-up area for the city ban on coal zone and gradually extended to improve the quality of atmospheric environment on request. Counties (cities, districts) need to improve the people's government should ban on coal zone demarcated according to the ambient air quality.
May, ban coal-fired power plant area, central heating stations and raw coal units shall establish a coal purchase and sale of its products archives management, and self-purchase contract is signed or change within fifteen days, the number of coal procurement and information submitted to the seat of county government department in charge of energy.
6, city and county (city, district) people's government should promote the local conditions of the administrative regions of central heating, coal to electricity, coal gas and other clean energy alternative to coal-fired work. Encourage towns, rural areas to promote the use of clean energy living stove.
9, city and county (city, district) people's government should strengthen the management of civil bulk coal regions other than coal ban areas, to determine the clean coal supply companies, establish and improve civil cleaner fuels coal procurement, storage, supply mechanism to protect the clean coal supply.
10, city and county (city, district) people's government market supervision and management departments should be included in the annual coal-fired coal sampling plans to strengthen quality supervision and inspection, and to the public inspection results.
11, coal-fired power plants, district heating stations and boiler units to use raw coal output and single kiln production process should be in line with national standards and local regulations or policies. Any unit or individual may manufacture, import, sale and use do not meet environmental protection standards of boilers, furnaces.
12, supporting the construction of coal-fired units should use air pollution control equipment and facilities to maintain normal and stable operation, pollutant discharge should meet the standards set by the state and local levels. Encourage the use of coal-fired units to implement ultra-low emissions transformation in accordance with the requirements of environmental protection.
Ordinary gas condensing boiler with integral gas boiler parameter comparison:
1, different thermal efficiency of the boiler
How to properly use a high-temperature boilers, heat one of the special equipment of high pressure. Agencies, utility companies and the use of a wide range of industries, is dangerous and special equipment. Once an accident involving public safety, it will cause huge losses to life and property of the people and the country. For public safety, people's lives and property safety, according to the State Department's "Special Equipment Safety Supervision Regulations", should be used with boiler note the following: 1, should be accompanied by "technical safety specifications of the design documents boiler factory, product quality certification , safety and use and maintenance instructions, supervision and inspection certificate (safety supervision and inspection certificate performance). " 2, boiler installation, maintenance, alteration. Engaged in the installation of the boiler, maintenance, renovation of the unit shall obtain special equipment installation and maintenance certificates issued by the Provincial Quality and Technical Supervision, before engaging in the boiler installation, maintenance, alteration. Construction unit before construction will be prepared for installation, maintenance, alteration in writing inform the special equipment safety supervision and management department of the municipality or district, and will start informing sent to the local county level Quality and Technical Supervision for the record, told immediately after construction. 3, inspection of boiler installation, maintenance, transformation. After construction, the construction unit To State Quality and Technical Supervision of Special Equipment Inspection and hydrostatic testing of the boiler installation supervisory inspection declaration. After passing by the State Quality and Technical Supervision, State Special Equipment Inspection, County of Quality and Technical Supervision involved in overall acceptance. 4, registration boiler. After the boiler inspection, the use of units must be in accordance with the "special equipment registration and use of management rules", fill "boiler (census) Registration Form", the State Quality and Technical Supervision to register and obtain a "registration certificate to use special equipment safety . " 5, operation of the boiler. Boiler operation must be performed by trained and qualified to obtain "special equipment operator certificate" certified personnel to operate, must strictly abide by the rules and eight systems, six record. 6, check the boiler. Periodic inspection of boiler once a year, not be used without safety periodic inspection of boilers. Safety accessories safety valve of the boiler regular inspection once a year, pressure gauge biannually verified, may not be used without the periodic inspection of the safety accessories. 7, non-pressure boilers will be installed for the boiler pressure. Do not use water level gauge, safety valve, pressure gauge three safety accessories insufficiency boiler.