3 ton boiler in textile engineering
Why food plants need steam 3 ton boiler in textile engineering steam boiler plant food decompression valve Why do we need decompression valve? Food plant with steam boiler range is very wide. For example biscuit factory is required for drying operations for biscuits. Steam boiler, often controlled by the pressure reducing valve and the steam output of the high voltage equipment. 1, the boiler plant food typically produce high pressure steam, which can reduce the size of the boiler, reducing the incidence of wet steam, dry steam is improved, long-distance transport. 2, due to changes in vapor density of the higher density of high-pressure steam, the same diameter pipe conveying capacity than the low pressure steam, high pressure steam delivery pipe size can be reduced, cost savings. 3, when steam condensation occurs, the condensate pressure is reduced under reduced pressure, condensed water can be discharged to avoid flashing, a small energy loss when a low pressure condensate.
When use of electric 3 ton boiler in textile engineerings, power costs are: 1 kWh of heat is 860kcal / kWh × thermal efficiency of 90% = 774kcal / kWh; 1 tons of water power consumption of 35000kcal ÷ 774kcal / kWh = 45.22 degrees,
Beiqi Panther car 6 tons of steam condensing one fuel gas steam 3 ton boiler in textile engineering project has been successfully completed. This series boiler adopt advanced design concepts, using the waste heat of flue gas cascade, with the use of the condenser and the economizer fully absorb the waste heat in the flue gas, the boiler efficiency has been greatly improved.
How gas hot water 3 ton boiler in textile engineering gas hot water boiler installation pipeline installation, first select the qualified product, then follow the steps for installation and commissioning reasonable, it can allow the boiler to function properly, to achieve the desired effect and the effect of the installation. The following major steps to introduce hot water boiler pipe installation: 1, water supply pipeline installation, the device should start pipe ends, pipe connection to the device on the basis of outwardly extending, and note installed below the heating pipe. 2, the hot water pipe installation, the installation should have a certain slope in the same direction with the hot water flow. Exhaust valves disposed highest point, surface drains connected to the drains. Lowest point set trap, guarantee easy operation. 3, installation sewage pipes, sewage pipes and valves and equipment are connected by external flanges, all welding. Pipe elbow should be used sparingly.