model steam boiler for sale
When using heavy oil, heating and model steam boiler for sale check the fuel control means, and switch on the view oil burner tube group. Advisory oil viscosity required from the manufacturer to ensure that the burner is working properly, and regularly check the heavy oil or residual oil viscosity to meet the requirements.
When operating the boiler, what is the "waters"? When the boiler water gauge did not see the water level, wash first with water table method to determine water or with water. If it is determined that water, water level meter for even the highest fire tube boiler is lower than the boundary, emergency shutdown immediately, reducing the furnace temperature, the main steam valve and to close the valve. For larger capacity of water, and the water boiler higher than even the highest fire tube boiler industry, can be "called water" method to determine the severity of water shortages, in order to take appropriate measures. When the "waters" to determine water shortage is not serious, it can continue to the boiler feed water, the water level returned to normal, gradually warming up to start burning equipment, boost operational. Through the "waters", sentenced to severe water shortages, have emergency shutdown, non-blind feed water to the boiler. Never allow chances attempt to cover liability resulting boiler water shortage and water supply blind. This wrong approach often lead to disaster, expansion of the accident, causing the boiler furnace explosion and crash. The method of "waters" are: (1) turn on the water tap open water table. (2) stripping off cock. (3) close the water cock. (4) and then turn on the water tap is closed. (5) and then turn the tap water, to see whether there is water out from the water pipe is connected. If out of the water, the water is slightly; if no water appears, proved to be a serious shortage. "Waters" process can be repeated several times but not delay too long, so the expansion of the accident. "Waters" principles of operation are: After draining cock open, then close the steam, the water pipe connected between the water cock and the table, so that a large vapor communication with the water table, water gauge pressure is zero. Then again closed drain cocks open water pipe connected between the water cock and the water table, because the pressure within the drum water level higher than the inner pressure table, if the drum water level is in the vicinity of the water pipe connected to the water vapor stream is brought into water table, which shows the extent of water shortage is not serious. If the "waters" has never been in the water table level, water is considered more serious.
Different tonnage and pay the difference between the volume of water level and temperature requirements model steam boiler for sale: steam boiler, which is a boiler, but all of us, this is a must have comprehensive knowledge and understanding, because the only way to operate correctly steam boilers, and at the same time, access to the product good use of effects and economic effects rather than the incorrect use of this kind of boiler, and adverse effects or cause economic losses. 1.4 tons and 6 tons of steam boiler, what is the difference? 4 tons and 6 tons of steam boilers, literally, the difference between them, are on the tonnage of the boiler, if it continues to go deep, then, at the rated power, the former offers four tons per hour of steam, the latter provide six tons of steam per hour. So, two different tonnage of steam boilers, there are still many differences of. 2. The volume of steam boiler water level, generally much? The volume of water steam boiler, the boiler is the main manufacturer of the product design, as well as specific about the type of boiler, for example, coal-fired steam boilers and oil-fired boiler, the water level in their volume, is certainly not the same. So, on this issue, there is no specific answer, except to say, according to past experience, steam boiler fuel type, the volume level in about 4-5 tons.
Since I began preparations for the 2018 ASME certification program, and at the beginning of the project preparation work since January this year, the project has entered a crucial stage of the implementation. Ms. Jiang Lianju quality system under warranty division led to ASME certification were careful overall planning work to develop a detailed plan of the evidence, and careful organization departments to participate in the work of the various stages of implementation.