Fabric Steam Generator Rubber Hose
Further, the electrical heating device previously used the system will be replaced every time a segment of the circuit board, the reactor now supporting the fabric steam generator rubber hose, not only saves the cost of the circuit board, the circuit board also avoids damage caused by impact on production. Li Pu heat steam generator high thermal efficiency, fast gas, vapor produced pure health, one-button operation, simple, embodiment of steam heating, can be said to serve multiple purposes, so that the cost of chemical control to a new level.
Boiler Room universities loss to deal with the past most colleges and universities are using a large steam boiler to produce steam for the canteen, water, bathing and heating, where steam is needed where to send, it is a waste. Now with fine design: Principles Steam steam equipment, water equipment with water, with hot water apparatus, and use the nearest, so as to save energy, reduce the cost, the effect manageable. Many schools have been rebuilt by this idea, achieved very significant results, the general transformation of the cost can be recovered within a year. Steam canteen: finned pipe steam: steam plant to meet all requirements; water: gas water heaters + finned steam pipe; water: air source or a solar-based, auxiliary heating gas hot water unit. Partly because of the loss of boiler: 1. Low efficiency of the boiler itself, and after prolonged use efficiency decreases, because: furring furnace, burner efficiency drops, Slagging ashes. 2. duct body loss, loss of pipe insulation, pipe insulation damage after loss increased. 3 does not match the amount of steam, Mara car; a pressure in excess terminal mismatch loss. 4, water in large boilers, heat loss, downtime restarted great heat need; 5, bulky water tank, heat dissipation area, and the insulation layer and the insulation layer thick enough damage; new boiler efficiency up to 90% but after using the terminal, the effective utilization rate of less than 40% utilization rate is even lower for some time, as long as the use of large-tonnage steam boiler on the above factors can not be avoided. Hot water bath, hot water within 40-60 degrees, a low quality heat, is a high quality hot steam, heating with high-quality low quality heat, certainly uneconomical. Hot water bath solutions include: solar energy, heat pumps (air source, ground source), gas water heaters and the like. How specific choice, depending on use environment, temperature, sunlight time, gas prices, electricity prices and other factors, to analyze specific issues. Cafeteria steam boiler is the key to solve the problem of stopping, previous methods to solve: 1 steam boiler generally cost at least 300 yuan / ton, the school used for steam dealers by way of subsidies. 2. The direct-fired equipment is generally used, the thermal efficiency is generally not more than 40% .3 use in a boiler or regulatory edge pressureless fabric steam generator rubber hose, the same thermal efficiency only 40%, the cost is greatly improved canteen business operators, operating simultaneously also very troublesome. There are other issues: bulky, large footprint, small stand-alone power, need several more, no vapor pressure, high water content, water is not treated with the use of prolonged increasingly inefficient, short life. Now Resolution: With the LEADER gas steam and gas water heaters, boiler room can easily solve the problem of losses, so that the school canteen dealers can be satisfied. LEADER gas steam characteristics: 1, no boiler room, without the need to handle the boiler permits, without kotelshchik: This product volume of less than 16 l system, outside the scope of the Boiler and Pressure Vessel requirements. 2, the use of the nearest: loss of small pipe. 3, high efficiency: oxygen-free copper fin heat exchanger thermal efficiency of 93% .4, modular combination: according to different needs of users for the amount of evaporation, the amount of hot water, tailored. 5, steam pressure up to 1.4kg, fully meet all the requirements of steam college canteen equipment. 6, high-power, small size: the largest single power of 300KW, the volume is only (L * W * H) 1050 * 400 * 1200MM.7, safe: with multiple security protection. 8, the processor is configured softener: water softener use of efficient processor, effectively preventing thermal efficiency reduction unit and pipeline clogging. 9, transformation action, low cost: the use of this product were boiler, gas flow, gas pipeline generally without transformation, the use of other equipment and without transformation.
Hot water boiler vaporization problem the whole solution 1, hot water boiler steam boiler of the phenomenon (1) boiler and pressure suddenly increased safety valve starts to emerge from the water and steam in the expansion tank. (2) the impact of sound water boiler, pipes to vibrate. Impact or the like occurs in the water (3) circulatory system piping. (4) a sharp rise in the temperature of boiler water, over-temperature signal overtemperature alarm occurs. 2, because (1) hot water boiler pot all the water vaporization operator negligence or misuse. Such as forced circulation hot water systems, at startup, the first boiler ignition, after the circulation pump. When shutdown, stop circulation pump, after stopping the boiler operation; or storage of fuel and heat in the boiler does not distribute all do, eager to stop the circulation pump is running and so grossly erroneous operation. (2) the occurrence of circulating hot water boiler outage, improper handling. (3) hot water boiler circulation system or severe leakage, device malfunction or constant pressure, causing a sudden drop in pressure in the boiler. This situation occurs mainly in the high-temperature hot water boilers. (4) cyclic interrupt occurs, although the boiler immediately stop running, but the remaining fuel in the combustion chamber and heat storage water vapor of the pan. This usually heat storage capacity in the furnace, the occurrence of a small pot of water volume of hot water boiler. (5) stop the pump sudden power failure or failure of the circulation pump. (6) the temperature of the hot water boiler, the pressure indicating instrument malfunction, resulting in erroneous judgment. 3, the reason the hot water boiler local vaporized boiler water (1) within the reservoir portion of the tube boiler scale or debris, the local destruction of the boiler water cycle. (2) a boiler structure unreasonable or undesirable combustion conditions, resulting in the line between the parallel deviation is too large heat boiler or boiler water uneven flow distribution, resulting in local overheating vaporized. Local and overall circulation circuit (3) can not form a natural circulation boiler, causing local overheating of vaporized water circulation circuit occurs once the pump stops and the like. 4, treatment of hot water boiler steam boiler (1) stops running hot water boiler. (2) Check the hot water boiler and heating cycle causes vaporization system, and processed. (3) hot water boiler and hot water heating system natural circulation loop, loop back to the natural valve open road. (4) When a sudden power failure, the pump stops running, stopping in the boiler water cycle (forced circulation boiler), the temperature of the boiler water continues to rise due to heat accumulation surface of the combustion chamber of the boiler water to steam, because of a large water capacity If handled properly, usually does not cause accidents pot of water vapor. For hot water boiler tube DC (most of this is domestically produced boilers), because of its small water capacity, when a sudden power failure stop the pump, resulting in more accidents pot of water vapor. Hot water boiler should have suddenly prevent or mitigate the pot of water vapor measures to stop the pump during a power outage. China is now using more is to add water to the boiler and the boiler outlet slow release of steam, the pot of water on the one hand to maintain liquidity, on the other hand reduce the water temperature, up until the elimination of the combustion chamber of the regenerator. Some install the spare circulation pump driven by the internal combustion engine, when a sudden power failure, start the engine, but poor when asked to take into account, because the engine is not instantaneous will be able to start. There is provided a self-standby power supply or generator.
To implement the "Blue Sky Hohhot to win the Battle of three-year action plan," Hohhot ecological Environment Agency and vigorously promote the city's coal-fired boilers mentioned standard transformation and treatment, formulated the "65 steam tons / hour or more coal-fired boiler and governance to promote the program." clearly this year will focus on the 65 steam tons / hour or more coal-fired boilers and in particular the implementation of ultra low emission limit values renovation work to further reduce emissions from coal-fired boiler pollution, improve the city's quality of atmospheric environment.
Program clearly states that the city has 58 coal-fired boilers will be completed before the end of the transformation, in which five large-scale district heating enterprises 65 steam tons / hour and over the implementation of ultra-low emission coal-fired boilers transformation,
16 65 steam tons / hour or more coal-fired hot water boiler to complete the transformation of governance. To ensure the smooth implementation of the mentioned standard treatment project, municipal environment bureau called on all localities in strict accordance with the "grid" management approach, down to every level will be the task of transformation, to the people, the letter coal-fired boiler to complete the task, each Related enterprises should play the main role, strict compliance with environmental laws and regulations and energy-saving standards, to complete the task on time.
To step up supervision and municipal environment bureau set up a special steering committee to implement the "Fortnight scheduling system", the city's coal-fired boilers governance supervision, the work of the task is not implemented, governance behind schedule, promote ineffective areas and enterprises to implement early warning and interviews, due to the unfinished task of accountability.