factory direct water tube boiler
8 tons of industrial steam factory direct water tube boiler how much the price of 8 tons of industrial steam boiler price how much? Currently in the process of industrial production, a lot of places were you can see the figure of a steam boiler. Therefore, the amount of current industrial demand is still very large. Basically demand is great. Generally required tonnage basically concentrated in about 10 tons. Recently, there is an industrial consulting company need to purchase a steam boiler fast boiler, but for specific models and prices not very understanding. So let Fang fast technical staff to help carry out the accounting model used, there is the price of the basic budget of the procurement. In this regard, technical staff fast boiler for the actual situation of the industry manufacturers to understand, out of accounting data show that the industrial enterprises with an 8-ton industrial steam boilers are produced to meet the needs of the present, the model price is about 960,000. So, for everyone 8 tons of steam boiler prices already have detailed understanding.
The thermal efficiency of the factory direct water tube boiler to improve the method: the thermal efficiency of the boiler is directly related to the economic interests of the boiler's, so the design efficiency of the boiler is definitely the most care indicators boiler users, which determines the operating costs of the boiler, in general, boiler the higher the efficiency, the lower the fuel consumption, will directly reduce the operating costs of the boiler.
Diqing in Yunnan Nonferrous Metals Co., Ltd. mainly engaged in Pulang copper mining, site selection, sales and other items. As we all know, in the copper smelting process, it consumes a lot of electricity and thermal power resources, which account for most of the hot water consumption. Combined with the actual demand Diqing company, to provide fast Boiler 1 stage electric heating hot water factory direct water tube boiler of 2.1MW.
Condensing steam factory direct water tube boiler used to warm the pipe does not cause local low pressure condensing steam boiler steam suddenly not send warm the pipe inner steam pipe freezes, forming a localized low pressure steam condensate entrained impact to a lower pressure, water hammer occurs waterhammer pipe can deform bad shock, damage to insulation, the pipe can be serious when shattered. Thus the steam must be sent before the heating pipes. Condensing steam boiler before the heating pipe, the first open all traps on main steam line discharging condensate accumulated in the steam pipe, and then slowly open valve main steam condensing steam boiler of about half a turn (or slowly opens the bypass valve), so that a small amount of steam into the pipe, so that the temperature gradually increased, until the pipeline is fully warmed up and then condensing the steam boiler main steam valve is fully open. Isolation valve between the conduit and the boiler when the boiler is running simultaneously several, when a new condensing steam boiler into operation if the main steam isolation valve is connected to the main steam pipe valve also require heating pipes. Warm-operation may be performed in the above stated method, it may be open all the trap before the main steam valve and the isolation valve in the condensed steam boiler Stokes, using steam generated in the boiler during the boost to slowly warm. With the boost heating boiler pipes and boost heating up, so not only eliminates the need for time to warm the pipe, but also safe and convenient. Single boiler operation. The steam pipe is not long, this method may also be employed for heating pipes. When heating pipe, such as pipe expansion and found to support and hanger has not normal, or large shock sound, indicates that the temperature rise is too fast heating pipe, the steam supply to be slow speed, i.e., slow down steam valve opening speed, to extend the warm-time. If the sound is too large earthquake, steam valve should be closed immediately stopped and opened the big trap to warm the pipe, to be carried out to identify the cause and then eliminate the fault. After heating pipe, closing the trap on the pipe. After preheating steam pipe, the steam supply can be carried out, and the furnace.