5 mw per hour fire tube boiler price in Medan
What condensing 5 mw per hour fire tube boiler price in medan water scale hazardous due to the condensing boiler is located in a different region. There are differences in the water hardness. When high chloride content and sulfate in water, in the condensing boiler as the water will continue to evaporate, so that they go beyond the limits of its saturation concentration is precipitated, and the drum, adhering deposition of water wall, and gradually form hard , insoluble in water scale. Multi scale deposited within the drum and the heating surface of the water wall, causing great harm to the condensing boiler and its operation. The main harm is done to scale: (1) scale is a poor conductor, its thermal conductivity is 1/5 of steel, the scale will affect the heating surface thermal conductivity. The increased thermal resistance due to heat caused by fuel waste, reduce the thermal efficiency. (2) due to the poor thermal conductivity of scale, fuel combustion heat is not well transferred to the water by the metal surface, resulting in the metal heating surface temperature increases overheating, reducing the structural strength of metal, and causing the drum is deformed Wall table, drum kits, tube wall section is reduced, which can result in poor circulation can not even over the water and cause water wall tube burn accidents, severe cases can lead to burst pipes. (3) When people using a chemical or mechanical cleaning descaling, will cause corrosion of the metal of the inner wall injury or reduce the life of condensing boiler.
4 tons of gas hot water 5 mw per hour fire tube boiler price in medan should be equipped with big water tank? One of the hot water boiler auxiliary tank is essential, then, depending on the tonnage of the boiler, the required tank size is not the same. Boiler tank for storing substantially demineralized water and oxygen. If that is a gas hot water boiler 4 tons, and return water temperature of 95/70 to count, fill water in the proportion of 3% to count, in substantially the desired size of about 3 cubic tanks, of course, based on the actual situation may be nudging up a certain number of cubic meters. In addition, four tons of gas hot water boiler with tank carrying, in addition to concerns tank material, but also pay attention to the water tank for regular checks to avoid the water tank leaks and other anomalies in the process of long-term use, the boiler operation unnecessary disruption. Meanwhile, the water into the tank should also be softened to ensure that water quality standards, in order to avoid post-precipitation of impurities caused by corrosion of the tank and impurity precipitation and other phenomena.
5, should be marked on the dial face has a red line indicating the work pressure 5 mw per hour fire tube boiler price in medans.
6, after the hydrostatic test safety valve should complete the installation of boilers, pressure safety valve should be adjusted at the time of the initial Stoke. Safety valve should be installed in exhaust pipe, exhaust pipe should pass a safe place, and there is sufficient cross-sectional area to ensure smooth exhaust. Safety valve exhaust pipe should be equipped with a bottom drain pipe grounding a place of safety, on the exhaust pipe and do not allow the drainage pipe valving.
7, independently of each boiler should be installed outfall, sewage elbows should be minimized to ensure smooth and sewage to the outdoors a safe place, a combined total of several sewage, must have proper safety measures adopted stressful blowdown expansion tank should be fitted with a safety valve on the sewage tank.
Zhengzhou Sunrise Optoelectronics Technology Co., Ltd. by the Dongxu Group, Henan Province, the state-owned asset management companies and Zhengzhou Investment Holdings Limited jointly made, mainly engaged in flat panel display and solar industry design materials, manufacturing and sales operations. Sunrise Optoelectronics project has been put into a production line, the second phase will continue the expansion, three new production lines to meet the production needs of Project Phase II, Sunrise Optoelectronics urgent need to increase new 5 mw per hour fire tube boiler price in medan equipment. After investigation and screening of a number of boiler brands, determined to cooperate with the fast boiler, steam signed a 10-ton integrated condensing gas steam boiler (WNS10-1.25-Y.Q).