saving coal fired hot water boiler
Be careful when selecting which pressure steam boiler cold day, as long as the pressure steam boiler can feel as warm spring, enjoy the convenience of hot water. Extra large saving coal fired hot water boiler quality of life greatly improved. Pressure steam boiler easy to use, but at the time of purchase the user must also confused how to buy, so the need to pay attention to what needs to choose when pressure steam boiler detailed understanding of. 1, determining the purpose of buying pressure boiler steam boiler, you should consider the different environmental requirements. If the client needs heating, should be selected special pressure steam boiler is heated by circulating hot water in the hot water pump recycling. Back to the radiator, i.e. a heat sink, to deliver heat to every corner; hot water only, select a particular hot water, hot water circulating through the pump, hot water tank of hot water circulating in the hot water supply; number of users need to have two choices, so they have to choose to increase the heat exchanger in the piping system, so using two atmospheric pressure hot water boiler. 2, the heating area is determined, the amount of water by the calculation cycle, the required amount of hot water, boiler design used to determine the heating area or field. Accurate and scientific calculation and design can meet the requirements, without wasting resources. 3, to determine the fuel, style pressure boiler, coal or natural gas hot water boiler steam boiler in three common, the boiler is electricity, gas hot water boiler coal or natural gas as an energy source. When selected, you can choose your own needs or favorable conditions. As long as meet the requirements of the boiler room, the style of choice should be simple and suitable for horizontal or vertical.
Industrial gas steam boiler room planning considerations: industrial gas steam boiler room Planning Considerations What? Followed by the degree of technological progress from time to time, the rapid expansion of social economy, people's requirements for industrial gas boiler room planning have become more sophisticated. Now now, in the industrial gas boiler room planning there are still many achievements in urgent need of treatment, therefore, we have to enhance the learning and use of advanced planning practices and advanced technology, from time to time suspend the development and review of industrial gas boiler room planning, the industrial gas boiler housing plan is more suitable, safe, reliable and economical. 2, selection and use of industrial gas boiler at a reasonable selection of urban planning, boiler, environmental management and other mission boiler type is dropped purification, waste power, an important part of reasonable expenses. Set the cost of the boiler is one of the essential elements of when thinking of selection. Because the characteristics of industrial gas boiler itself, the boiler room and equipment to establish a more economical, should be used in high load industrial gas furnace heat boilers in order to reduce the volume of the furnace. Due to the absence of heating surface cleaner, slagging, wear results, the smoke may use a higher speed, reduced scale of the convection heating surface, convection through the rational placement control the industrial gas boiler capacity of coal-fired boiler with a more compact structure, dimensions small, light weight, in order to decrease equipment investment; supporting auxiliary boiler optional satisfactory work. Industrial demand for gas-fired boiler is not equipped with soot blowers, dust, slag and other equipment and fuel dryer slave device, and can save and land acquisition costs placed above equipment; the use of a gas pipeline walks as boiler fuel, not only no fuel storage equipment, supply calm and without prior preparation of fuel processing equipment, greatly simplified the trivial; civil engineering boiler room investment costs and other related costs will lower; no fuel storage, can save shipping costs, place and rest force. Boiler room non-essential equipment such as leak detection equipment for the surge equipment, measurement equipment, gas. Coal, oil, gas boiler three kinds of heat load in the opposite situation, a huge volume of coal-fired boilers, additional slack style drums, Fan, Java machine, dust collector, but also with storage of coal, slag heap place, It covers an area larger. Industrial gas boilers small volume itself, and these need not be equipped with auxiliary equipment, simply set up between a host and auxiliary room, set on more messy, covering economy. Industrial gas boiler city gas source is generally taken from the intermediate pressure gas supply line, the gas pipeline laying gas sampling point to the boiler room, then according to quell's brand, type and caliber regulating device applications, scheduling outlet pressure range, by metering the put into use. Establish a set fee just gas network tariffs, pipeline fees, hot walks pipeline fee. Gas pipeline network overall cost of capital is the sum of the gas company funds charged to the user, it can be determined depending on the circumstances around the gas company. Usually adopted buried gas pipeline type, buried depth is generally about 0.8m ~ 1.0m, seamless steel pipe can be selected or PE pipes, pipe surrounding sand 15cm ~ 20cm plating, hot water pipe laying relatively simple, somewhat messy steam pipe walks . 3, industrial gas boiler room planning results in the presence of 3.1. Selection of the size of the heat load of the boiler and its expansion tend to choose the boiler capacity, the number of great links. The larger heat load, single boiler capacity should be large. The near future can be greatly increased thermal load, it is also relatively large capacity boiler can choose, it will expand the load thought. The only thought to increase the long-term thermal load, the expansion device may leave the boiler placeholder deployment end in the boiler room, or space left on the total FIG. However, in the practice of project planning, often there is a lack of expansion heat load estimates, constitute improper boiler selection, pre-operation to cause unnecessary trouble. 3.2. Gas boiler gas regulator trivial results generally used in high-pressure (less than 5kPa) and medium voltage (5 ~ 150kPa) trivial. Gas usually before entering the boiler room will arrive this requirement. Now the gas saving coal fired hot water boiler is equipped with a high level of automation subsided, a calm requires the gas pressure is lower, so before further demand into a calm pace pressure boiler manufacturers themselves generally equipped. Gas pressure regulating trivial demands reliable equipment, but on the size of the gas pipeline valve is open due to the gas pressure when scheduling the gas pressure is high or low, and tempering will cause off, start and stop frequently subsided's configuration, thereby affecting the boiler work. 3.3. Gas boiler quality results planning standard gauge, the quality can not be ensured when the gas, should be provided or dust, oil and water, respectively, and a total closed drain valve before the gas main pipe before the regulator device. Most of the oil production plant in the use of oil with anger, it is often said of moisture in the summer cold weather, moisture and light hydrocarbons and other substances containing moisture, condensation will constitute a line blockage, an initiative to quell the flame, impact Heating. 3.4. Chimney condensate results because of the high thermal efficiency of industrial gas boiler, a low exhaust gas temperature, typically 180 degrees, the boiler room planning criteria (GB50041-2008) rules industrial gas boiler room chimney should be reinforced concrete or steel chimneys chimney. Chimney will appear directly in the outdoor summer steel chimney condensate freezing results, constitute icing light rusty steel chimney, would constitute a temporary corrosion, freezing severe affect chimney smoke. 3.5. The amount of air to quell the outcome's when quell Industrial gas boiler is in the boiler room, the air between the boiler must be satisfied the requirements apply to quell the device, otherwise there will be no abundant natural gas to quell working carbon monoxide poisoning.
Fangkuai Group adopts the concept of “moulding character and creating high-quality products”, and continues to research and continuously improve the technological content of products to get closer to users. With the mission of “creating convenient and fast boiler high-quality products for users”, it uses remote monitoring, APP, and active return visits. And other channels to provide users with convenient and efficient services; with the core values of "professionalism, lean work" as the core value, established an effective enterprise management system, adopted ISO9001 quality management system, OHSA18001 occupational health and safety management system and ISO14001 environmental management System certification; and cultivated a large number of high-quality employees with norms of behavior, professionalism, and continuous commitment to provide customers with more convenient and efficient services.
Small series to introduce horizontal steam boiler steam boiler arch horizontal tube plate with threaded pipe drum composition, high heat transfer efficiency, boost fast enough output, high overload capability, hard fouling smoke tube. Today, let us together look at it. Horizontal welding binding sites steam boiler using high-temperature region and large machining bundle special treatment to ensure the welding quality and service life. Flammable, widely used fuel, burn bituminous coal, anthracite coal, firewood, industrial waste, organic waste and so on. It solves the problem of tube plate crack, eliminating the dead zone at the bottom of the drum, good water cycle effect, prevent the lower drum drum kits. Horizontal steam boiler compact structure, small dimensions and saves capital investment, easy installation, tipping valves, and piping to run hydropower. Stable, easy adjustment, the unique design of air sealing, bank up a fire a long time. Times atmospheric pollutants are oxides of dust, sulfur and nitrogen contained in horizontal steam boiler flue gas, which can achieve emissions targets Protection index when a predetermined number of times to unpurified. These substances emissions control combustion pretreatment, improved combustion techniques, dust removal, desulfurization and denitration. By means of a high chimney stack can reduce the concentration of pollutants in the atmosphere of the area.