Horizontal Energy Saving Diesel Oil fired 2 Ton Industrial Steam Boiler
If there is damage in the supposed gas-fired? Detailed inspection is important, as the key oil regulation. According to the conditions and time management, gas-fired, people can effectively damage inspection program. The application of oil, people strictly control the particle size of coal and dolomite. Should strictly control the particle size of bed material. Should be addressed furnace waste. To be able to solve the waste furnace after discharge. Natural gas boiler should be installed in areas where the application of calories, easy to install. Heating pipe can not be too long. It should have a good cable jacket. Water piping for an output from moderate to tail skew. Water resources to be equipped with a pressure regulating valve. As sewage gas, natural gas boiler chimney should widen to the outside, a heating furnace entrance width 1.5 to 2M. If you want to reduce the harm to the water wall tube can be appropriately regulate air pressure and wind speed and reasonable to reduce damage to the water wall. Inspection time is generally standby shutdown or shutdown condition. To check top head comprising the furnace wall is damaged, leakage of the furnace airtight and smoke. In the damaged condition requires immediate repair and welding, in order to ensure that no problem in the operation of horizontal energy saving diesel fired 2 ton industrial steam boilers. Typically, before the ignition of gas-fired, fossil fuels must be added the charge in the combustion chamber, fossil energy and raw material-circulating bed material and gas in the wind, the strength and intensity of the flow down completely integrated. Bottom wind equipment, up for the core area. Exercise our powers in a ring outside the region along the furnace wall water swimming down, thus increasing the waiting time of coal particles in the furnace. Mineral particles, many of the ash and soot particles with a lot of fly ash, this resulting in rapid deterioration of the waterwall tubes continuously, so that damage to the wall thickness becomes soft, resulting in damage.
July 26, 2016, Beijing, China Everbright Paper Co., Ltd. and the company signed a "split 6 tons of steam condensing gas horizontal energy saving diesel fired 2 ton industrial steam boiler contract" by the company responsible for the WNS6-1.25-YQ split condensing gas boiler steam to all production, installation and commissioning work. The product is the use of condensing technology, effective emission of harmful substances SOx, NOx, COx, is industrial boilers efficient and environmentally friendly solutions.
Circulating Fluid Boiler has high working capacity and steam pressure than chain grate boilers. So, those cfb boilers are often used in larger industry sites such as power plant, oil refines, chemical industry, glass plant, bricks factory, rubber industry, etc. Coal fired cfb boiler has stable and good performance. The project of 85 ton coal fired cfb boilers to Mongolia has started in July 2014. Our consumer in Power plant from Mongolia by airport to Zhengzhou, China, visited our factory and talked with our engineers.
Three tempering tube hot water boiler installation and commissioning of the structure outlined hot water boiler is fast loading of the internal combustion level. A second high temperature flue gas successively washed roots and refluxed for three breathing tube, the smoke chamber into the atmosphere through the chimney. Gas hot water boiler equipped with the world famous burner, combustion using automatic adjustment, automatically adjust the water supply, the program starts, automatic control and other functions. The boiler has a compact, safe, reliable, easy to operate, installation speed, low pollution, low noise, high efficiency. Widely used in enterprises, hotels, hospitals, office buildings, civil construction and other industrial steam, life, mining and other facilities. This installation requires fast speed boiler installation, installation is very simple, the boiler does not require special ground base, only enough to withstand the ground to power. 1. Install the water supply line requires the highest level reservoir, generally not critical, the high from the ground to the reservoir tank, underground tank of water should be kept clean. Pool water outlet. For wire entrance filter water supply line. 2, the straight cross-section is mounted, the return pipe return pipe to be 0.5 meters above the bend radius should be 4 to 5 times the diameter of the pipe, the pipe should be installed at the highest automatic steam valve to prevent the steam from the pipe loop. At the same time, the general requirements of the highest level possible reliable reserve pool. When the boiler water level is below the line, the water will flow into the boiler when the next time you start. Filter wire 3 should be installed at the outlet (i.e., the inlet pipe) of the pool. Installation requires a supply line Burner fuel hose has two interfaces, and for the oil return into the oil, as long as the boiler return oil chamber and the oil corresponding feed pipe. Dedicated hydraulic system from the boiler tank to the burner pump port, an operation instruction for the burner 4 is provided. Chimney straight chimney installation requirements. The length of the chimney should not be too long, the stack height should be less than 5 meters. Chimney height should comply with relevant standards. Chimneys should be added raincap and smoke. Weight not directly on the boiler chimney host chimney 5, hydrostatic test shall be carried out after the installation of boiler water pressure test supervisor. Pressure test before proceeding to deal with internal boiler inspection, hydrostatic test pressure MPa, during hydrostatic testing, water pressure should slow down. When the pressure rises to 0.1MPa, the water pressure should be increased to 0.1MPa. When the ambient temperature is higher than 5C, hydrostatic test should be carried out; when the temperature is lower than 5, should be protected from freezing water pressure test. Hydrostatic test water is generally 20-70.6, should be as light fuel oil or gas oil (China) as the fuel, the fuel oil is generally heated to 100 deg.] C, a viscosity less 30E. Oil Qbw = 10200Kcal / kg LHV viscosity of the oil is lower than at 50 ℃ 200E, at less than about 80 ℃ 200E, 50e is less than the heat value of natural gas Qbw = 8550Kcal / kg LPG Qbw = 22000Kcal / kg.