industry hot water vacuum boiler agent
What are the characteristics of vacuum industry hot water vacuum boiler agents?
Vacuum phase change boilers in the industry are usually referred to as vacuum boilers. Professional vacuum boilers form a negative pressure vacuum environment within the enclosed furnace body. There is no danger of expansion and explosion because a vacuum boiler creates a low-pressure environment with little air, and then uses water to boil at a low temperature to produce steam. As a result, it is now commonly used in higher elevations. Let's find out what the features of the vacuum boiler are.
1, the vacuum boiler will not corrode because the internal structure of the vacuum boiler is negative pressure vacuum state, so it is completely isolated from the atmospheric pressure, so the pump pumps configured by the various units of the boiler will continuously discharge the steam from the unit. It does not corrode the internal structure, so vacuum phase change boilers perform fairly well in terms of durability.
2, safety and reliability are different from ordinary atmospheric pressure boilers. Because vacuum boilers pump air out of the inner container to form a vacuum environment, the furnace body does not work under the vacuum body in the course of use and will not be expanded by heat. It is not a pressure vessel, so there is no risk of explosion. At the same time, if the pressure increases due to faults or other perceived factors, the vacuum pressure switch automatically cuts off the power supply, so vacuum boilers are more reliable than other types of boilers in terms of safety.
Recently, the Weifang Municipal Quality Supervision Bureau investigation work for power plant industry hot water vacuum boiler agents, boiler pipes mainly the situation, avoid boiler due to pipeline damage caused by explosion or other accident, serious economic losses and social impacts.
Quality Supervision Bureau adhere to problem-oriented, carefully study and strictly enforce the AQSIQ and the Provincial Quality Supervision Bureau of the requirements for the range of power plant boiler pipeline design, manufacture, installation, inspection, management and regular inspection of the use of accurate knowledge boiler safety awareness the importance of strengthening the red line awareness, risk awareness and responsibility to play, continue to maintain high pressure, strengthen safety supervision work of the power plant boiler tubes.
Bureau of Quality Supervision focus on checking whether the boiler tubes carry out regular inspections in the construction of power plant boiler accessories combination whether to implement supervisory inspection of manufacturing, installation work unit level meets standard requirements, flow meter housing if there is a security risk, whether the use of units developed power plant boiler tubes emergency plans and emergency rescue exercises, in a timely manner to improve the problems found.
To date, Weifang City inspectors were deployed 257 times, check the power station boiler unit 58, checking in with a number of boiler 193 units, eliminate safety hazards 78.
Hot water industry hot water vacuum boiler agent furnace provisions of this kind of start and stop hot water boiler and what kind of steps required boiler blowdown, which is both a product and a website keywords website, it is necessary to be familiar with and understand, and to achieve this comprehensive degree, so as to achieve the proper use and rational use of the product, and then to have good economic benefits, at the same time, it also benefits from some of the harvest and inspiration. 1.29MW hot water boiler, which is equivalent to how many tons of hot water boiler? Hot water boiler, if it is 29MW, it indicates the rated capacity of the heating boiler, is 29 MW / hr per 1 ton 0.7Mw approximately equal to the standard in terms of words, 29MW equivalent to 40 tons, so that, 29MW hot water boiler, which is equivalent to 40 tons of hot water boiler, however, this is only a estimate. 2. The hot water boiler start-up and shutdown, and whether the provisions of the steps? Startup and shutdown of hot water boiler, which is prescribed steps. The boiler starts, first run of the circulating pump, and then ignite the burner and boiler shutdown, it is the first stop burner, circulation pump run for some time after stopping. However, the mode of operation, the traditional manual operation, as technology continues to develop and progress, been able to achieve computer-controlled operation, instead of manual operation. Furthermore, the steps may be set by the program is good, so that erroneous operation can be avoided. 3. atmospheric and vacuum and hot water boilers, which require a sewage? Hot water boiler pressure boilers and vacuum boilers, boiler during operation requires the sewage operation, for pressure hot water boiler, vacuum hot water boiler does not need to carry out this work, because: pressure hot water boiler, has a water system into the boiler, and the boiler is fired high-temperature water systems supply water softener equipment through post-processing can only remove most of the calcium and magnesium ions in water, but there will be a small amount into the boiler. So, when the calcium and magnesium ions reaches a certain concentration, the need for sewage operations, in order to avoid the presence of these ions, leading to problems with boiler operation. 4. If you know the rated working pressure hot water boilers, how to determine the safety valve set pressure range? Hot water boiler, if it knows the rated working pressure, it is possible to determine the safety valve set pressure range, the pressure on the lower limit value is 1.1 times the working pressure taken, but not less than the operating pressure plus 0.07MPa. Upper limit on the pressure, is taken 1.2 times the working pressure but not less than the operating pressure plus 0.1MPa.
Vacuum industry hot water vacuum boiler agent components have whatever industrial or civilian business, we often use the vacuum boiler is obtained, in short, now author'll tell you what constitutes a vacuum boiler-related. A blower: a filter disposed in the suction opening of the blower, when the air is absorbed into the device via an associated operating the burner, thereby adjusting the size of the fire. Second, the supply pump: A comparison of pressure from the condenser into the water softener below to take into vacuum boiler exhaust water generated in the thermal efficiency of the preheating time. Third, natural gas systems: an interface containing gas, burners, gas management system. Fourth, the safety valve: set a certain value, exceeds a preset value automatic pressure relief. Fifth, the vacuum boiler electronic control system and an additional more than this number would certainly be an integral part of the vacuum boiler, if the production process, the boiler marked poor water quality, is not to let the boiler starts, should be much more attention. In the process of production, the vacuum boiler to regularly check the overhaul, maintenance and carefully check the time record, only the most serious intentions of operation, perseverance overhaul inspection, standards can improve the effectiveness of increasingly large, will not adversely occur as a result of. When the vertical steam boiler burner ignited normal operation, why suddenly does not fire gas boilers | oil-fired boilers | steam boiler Environmental Equipment Co., Ltd. 1, gas access instability caused by volatility after the fireworks, not fire, cooking step: adjustment pressure load, back to work. 2, fireworks sensor failure. Test not normal when fireworks fireworks detection probe into the ground, or when James Gray, off occurs. Food steps of: adjusting the position of the probe, the probe remove dust from the outside, to start operating again. 3, parts failure. Unstable power supply, trigger off process. Cooking steps: Check the power supply and electrical contact wire.