high efficiency industrial boiler prices for textile industry
Why are gas-fired high efficiency industrial boiler prices for textile industry needed more places? Nowadays more and more places will basically see such a gas boiler equipment, then this device is also very important, relatively speaking, in many cases, we want to know is such a device, Why is it needed more places? First, the relatively high degree of automation: gas boiler now basically in the process of actual use will have more strength, to some degree, his family simply will not need workers to narrow the distance, or a high temperature and Some of the actual situation contact now to avoid those conventional gas boiler eye damage is relatively greater harm, but also to solve some burning stove phenomenon no one, certainly not in this one will have to consider, or is not able to meter Case. Second, high-grade auxiliary components: Today's gas-fired boiler in the process of processing, will have more requirements on the production process, all the requirements of all production processes are also very strict, and they pay attention to excellence, the other in various on a plate or other accessories, will have different procurement of various normative, even to be strictly controlled, even in the process of the entire procurement, must be carried out in accordance with the relevant effective processing speed reducer, because only in this way, their unit price relative to ordinary reducer able to several times more expensive. Third, environmental pollution: the process of gas-fired boiler during processing, to conduct a comprehensive test, but also to ensure that all fuel combustion, no other some black smoke generation, this is the case, of which there will be more burning process much gas, the concentration of carbon dioxide emissions even more pronounced below 900 milligrams per cubic meter, must achieve a national standard.
Hot water high efficiency industrial boiler prices for textile industrys are mainly used for heating and bathing. The hot water of the water tank can be heated by circulating hot water circulation pump and the hot water of the tank is heated again and again, which can realize the goal of bathing. The hot water circulation pump circulates the hot water of the heating pipe, and the radiator (radiator) can meet the requirement of people's heating, and the hot water boiler and the hot water circulation pump cooperate with the heat exchanger can realize the double functions of bath and heating. In the natural circulation hot water boiler, the inlet and outlet water are piped from the top of the pot. By the water intake pipe, the inlet water drop pipe is guided into the front and side of the header, and heated up through the water cold wall tube. Before the drum, the back end is down and up The riser boundary is provided with a water barrier, and only the lower part of the drum is cut off. For forced circulation, the inlet water is connected to the front lower header, the front water wall pipe rises to the top of the drum (when the front water wall drop pipe is cancelled), and then it is transferred to the side water wall drop pipe to the side bottom header, and then the side water wall pipe is put up to the up drum. From the front of the convection tube down to the down drum, finally, the bottom of the pot between several torches of water from the back of the pot.
Precautions
1, the general position of the explosion vent means in the top wall or the steam outlet of the boiler furnace furnace furnace side of the fuel gas flue.
2, explosion-proof doors should be installed in place without the threat of operator safety, and a pressure relief guide tube, it shall not be stored near inflammable and explosive materials, highly preferably not less than 2 meters.
Recently, the district government Qingyang City, Gansu Province, deputy head of Xifeng Wang Chao organized a remediation coal-fired high efficiency industrial boiler prices for textile industrys will promote the work. By the township (street), the head of district straight relevant departments attended the meeting.
Written meeting issued atmospheric district office "notice Leading Group Office of Air Pollution Prevention
Wang Chao requires that all relevant units must concentrate efforts to promote coal-fired boiler renovation, remediation to the control list, in strict accordance with the "three three must" requirements, to promote catch, this area, this system is not in place of coal industry regulation boiler immediately carry out concentration and control, to ensure that the work complete, fully put in place. To collaborate actively cooperate with the township (street) mainly clear time limit for rectification and reform measures, solid progress. To strictly control inventory and remediation remediation standards of accountability and strengthen supervision of the ideological hesitation wait and see, action is delayed, focus on promoting renovation is not complete unit, accountability seriously investigated.