industry 1 ton electric hot water boiler
Oriental Hawaii Holiday Hotel is located in Xiaogan City of Hubei Province in accordance with international five-star hotel standard design, set business rooms, SPA bath, foot care, indoor spa and other facilities in one of the hotel. Hot water industry 1 ton electric hot water boiler is one of the important facilities normal operation can not be separated. With the pace of Hubei Province in response to the national defense of the blue sky, the use of clean fuels gradually increase the proportion of Oriental Hawaii hotel provides visitors to the more perfect leisure experience a sense of the original wishing more polluted coal-fired boilers to replace clean and green gas-fired boiler. After comparing several vendors boiler industry, a number of R & D results very fast square value in the field of clean fuels, entered into a collaboration with the fast boiler. Fast boiler integrally provided a 1.4MW condensing pressure hot water boiler (CWNSL1.4-95 / 70-Y.Q) according to their actual needs. Put into use, fully meet the needs of Oriental Hawaii Holiday Hotel heating and hot water supply.
Precautions steam industry 1 ton electric hot water boiler used below Henan fast boiler with small series to introduce the company's attention to the point of steam boilers. Steam boiler safety knowledge: the need to view certain parts of the system for leaks, gas boiler should detect faults and repair, in order to avoid too much fresh water oxidation and expansion will accelerate system operation. Water heating system must be used for a long time is not empty, cut off the power, gas, water, among other factors. Check the electric connection is loose, aging, leakage protection switch is normal. Check the gas pipes in good condition, if there is an air leak. Steam boiler during the heating state of the internal combustion engine automatic start control, when the need to check the operating state of the machine, the state of the combustion flame, temperature changes, are likely to clog the filter. If, during boiler operation you smell gas, you must shut off the gas valve, quickly open the doors and windows, air circulation, and then request a professional service.
Principles of steam industry 1 ton electric hot water boilers and solutions hydraulic external gear of Henan fast boiler's small series with you about the principles of steam boilers and solutions Steam Boiler hydraulic external gear in accordance with the fuel (electricity, oil, gas) can be divided into electric steam boilers, oil three kinds of steam boilers, gas and steam boiler; constructed according to the steam boiler can be divided into vertical, horizontal steam boiler, steam boiler compact than a single, double return of the vertical structure, large steam boiler return of more than three horizontal structure . If the classification according to top standards, in the form of steam boilers on the lot, would like to give an ordinary packaged boiler say four tons vapor. Water in the steam drum is heated to become vapor, fire emits heat in the furnace, it is the principle of the steam boiler. Steam boiler combustion section and drive means by a chain grate, a combustion chamber together with the pan rack frame formed on a grate composition. Four weeks envelope refractories. From coal fired into the hopper, the shutter coal front portion while sealing air control seam thickness. Blowing into the combustion chamber is a lower place, such steam boilers greater resistance, require forced air. Steam boiler cinder burn out, the rear portion of the grate by the "beak iron" discharged from the slag out of the furnace feeding machine. Steam boiler flue gas from the back of the boiler, the steam drum of a boiler return line before the smoke tube, returned by two return rear smoke tube, and then into the dust separating ashes, and then discharged through the chimney draft fan. These are the works of steam boilers, steam boilers run course, ultimately, other devices, such as induced draft fan not only bear the task of exhaust fumes, or negative pressure necessary for operation of the steam boiler. As well as pressure vessels, thermometer, safety valves, pressure gauges, pumps, steam pumps, and so on. They are essential for steam boiler work. Pump leaks. Gear pumps for leaks during operation, leading to its actual output is smaller than the theoretical flow of traffic. The main channel is leaking gear pump: through the gap between both surfaces and both side surfaces of the gear cover side leakage, accounting for 75% to 85% of the total leakage of the pump; radial gear tip circle between the inner hole and the pump CLEARANCE ; gap by engagement of the gear leak. The gear pump due to the presence of a leak, so that the output pressure do not increase, the influence of the use of a gear pump. In order to solve the low gear pump output pressure problems, may be employed on both sides of the elastic gear plus floating collar or baffle manner, to reduce the leakage of the gear pump, the gear pump to increase the output pressure. Radial force imbalance. In the gear pump during operation, the pressure acting on the outer gears are not equal, resulting in the gear and bearing at the axle radial imbalance force. This unbalanced force will accelerate the radial bearing wear and reduce the service life of the bearings, the gear shaft deformation can also cause friction with the inner hole of the addendum pump, pump damage, so that the pump does not work. The solution generally adopted is: ④ opening pressure balancing grooves to the pump, the high pressure oil introduced into the low pressure zone, but will increase the pump leak, the influence of the volumetric efficiency of the pump; ② size reduction oil pressure chamber, acting on the teeth the pressure area is reduced, thereby reducing the radial force imbalance.
Selection of hot water industry 1 ton electric hot water boilers need to know what parameters are based on different premises heating, hot water boiler selection parameters provided are divided into the following sections: 1, hotel air conditioning and heating hot water boiler systems: the area with the hotel building (or design heat load), as well as the configuration of the refrigerator; hot water: the number of hotel rooms, kitchen, sauna, swimming pool water; the height of the main building, sanitary hot water if the subdivision, cold water supply (frequency, constant pressure, etc.); boiler room the location, size, and location of the interface floor height; used fuel: natural gas, diesel, or electricity after use diesel, natural gas needs to be replaced with. 2, district heating hot water boiler heating system conditioning: conditioning the floor area (or the design heat load) terminal to be used: the use of warm or heat sink, such as a partition, the need to provide heating area of each region; main building height used; Boiler room location, size, and location of the interface floor height; used fuel: the natural gas, diesel, electric or diesel, natural gas needs to be replaced with. 3, commercial establishments hot water boiler system, air conditioning and heating: Hotel construction area (or design heat load), and the refrigerator is configured to use; the main building height using hot water partition, cold water supply; boiler room location, size, height and floor interface position; used fuel: the natural gas, diesel, electric or diesel, natural gas required instead.